A flat pack wardrobe usually takes between one and four hours to build, depending on its size. A single door unit is often done in under an hour, a two door wardrobe takes around one to two hours, and a large four or six door design with internal drawers can run to three or four hours. Building a wardrobe from raw sheet material is a different scale of job entirely: expect a full weekend for the carcass and doors, plus a further day or two spread across filling, sanding and painting.
Those figures assume two things: that you have cleared enough floor space to work in, and that you are not doing it alone. Both make more difference to the total time than the complexity of the wardrobe itself.
A single door wardrobe has few parts: two sides, a top, a base, a back, one shelf, one rail and one door. Most people manage this in 45 minutes to an hour.
A two door wardrobe roughly doubles the panel count and adds a central alignment concern, since two doors have to line up with each other as well as with the carcass. Allow one to two hours.
Three and four door wardrobes take two to three hours, largely because the carcass panels are big enough that manoeuvring them becomes the slow part. A single side panel on a tall four door unit is heavy and awkward, and lifting it alone while trying to locate cam dowels is where things get dropped.
Five and six door wardrobes, and anything with a mirrored door or internal drawer bank, sit in the three to four hour range. Drawers are the hidden time cost: each drawer is effectively a small piece of furniture with its own assembly, and runners need adjusting after fitting.
Sliding door wardrobes are interesting because the carcass often goes together faster than a hinged equivalent, but the doors take longer. Getting two sliding doors running smoothly and sitting plumb takes patience with the adjusters, and that stage alone can absorb 30 to 45 minutes.
Reading the instructions is not the slow part, despite what everyone assumes. The genuine time sinks are more mundane.
Insufficient floor space is the biggest one. A wardrobe is assembled lying down and then stood up, and you need roughly the footprint of the wardrobe lying flat plus room to walk around it. In a small bedroom that means moving the bed out first. People who skip this end up assembling in a corner, working from awkward angles, and taking twice as long.
Sorting the fixings is the second. Flat pack fixings arrive in one bag containing six or seven types, several of which look similar. Ten minutes spent laying them out in a muffin tin or on a labelled sheet of paper saves considerably more than ten minutes of hunting later.
Working alone on large panels is the third. Two people do not halve the time on a big wardrobe: they cut it by more than half, because one person can hold a panel square while the other drives the fixings. Alone, you spend a lot of time propping panels against walls.
Discovering a missing or damaged part partway through is the fourth, and the only real answer is to check the contents against the parts list before starting. It takes ten minutes and it prevents a half built wardrobe sitting in the middle of a bedroom for a week.
Clear the room properly. Move the bed, roll back the rug, and put down a blanket or the flattened cardboard packaging to protect both the floor and the panel faces.
Unpack everything and lay the panels out in roughly the order they are used, faces down. Identify the left side and right side panels early: they are often mirror images with pre drilled holes on one face only, and fitting one the wrong way round means dismantling back to that point.
Have the right tools ready. Most flat pack wardrobes come with an allen key, and that key will work, but a cordless screwdriver with a low torque setting speeds things up substantially. Set the torque low: chipboard strips easily and an over driven cam screw ruins the panel. Also useful: a rubber mallet for dowels, a spirit level, a tape measure and a Phillips screwdriver for the hinges.
Read through the whole instruction sheet once before starting. Not to memorise it, but to spot the steps that are irreversible, particularly when the back panel goes on and when the doors are marked out.
If you are making a wardrobe from sheet material rather than assembling a kit, the timeline looks quite different.
Planning and measuring takes an evening. This is the stage worth over investing in: checking depths, hanging heights, whether the finished carcass will fit through the bedroom door, and drawing a cutting list.
Cutting takes two to three hours if you are doing it yourself, or almost no time if you have the merchant cut the sheets to your list. Merchant cutting is more accurate than most home setups and it makes transport far easier.
Assembling the carcass takes two to four hours, including checking the diagonals for square and fitting the back panel.
Fitting the interior, rails, shelves and any dividers takes a further two hours.
Making and hanging the doors takes three to four hours, longer if you are building framed doors rather than slab doors.
Finishing is the stage everyone underestimates. Filling, sanding, sealing MDF edges, priming and two topcoats with sanding between them spans two to three days because of drying times, even though the actual hands on work is only a few hours.
Add it up and a home built wardrobe is a two weekend project for most people. That is not a reason to avoid it, but it is worth knowing before you start.
A professionally fitted wardrobe installation typically takes a fitter one to two days on site for a standard run, assuming the doors and carcass components have been made to measure beforehand. Complex installations across a chimney breast or under a sloping ceiling can run to three days.
The lead time before that is the longer wait. Made to measure joinery generally involves a survey, a manufacturing period and then the fit, so the whole process from decision to finished wardrobe often spans several weeks.
By comparison, a ready made wardrobe arrives complete or as a flat pack and can be in use the same day. Our modern wardrobes UK sale range covers most standard bedroom widths, and we offer free delivery to most UK mainland postcodes, which matters if you are working to a decorating deadline.
If build time is a real constraint, some designs are simply faster than others.
Fewer, larger doors assemble more quickly than many small ones, because each door means marking out, drilling or fitting hinges, and adjusting. A modern 2 door wardrobes UK design gets you a working wardrobe faster than a six door unit with the same total capacity.
Wardrobes without internal drawers go together considerably faster. Drawers are the single most time consuming component in any flat pack furniture. If you need drawer storage, a separate modern chest of drawers UK sale assembled alongside is often quicker than fitting a drawer bank inside a wardrobe carcass, and it gives you more flexibility in how the room is laid out.
Wardrobes with mirrored doors take longer purely because of the care needed handling them, and they generally need two people.
If you are furnishing a whole bedroom, buying a coordinated set can save time in a less obvious way: the ranges share construction methods, so the second and third pieces go together faster once you have learned the pattern on the first. Our modern bedroom furniture sets UK sale selection is worth looking at for that reason as much as for the matching finish.
Start in the morning rather than after work. Flat pack assembly late in the evening is when mistakes happen, and a wardrobe half built at midnight has to be finished before anyone can use the room.
Budget more time than the estimate. If a two door wardrobe should take 90 minutes, set aside three hours. The buffer covers the missing screw, the panel fitted the wrong way round, and the tea break, all of which are near certainties.
Level the wardrobe before loading it. Adjust the feet or pack under the base until it is level in both directions, and fix the anti tip bracket to the wall if one is supplied. This takes ten minutes and it prevents the doors slowly going out of alignment over the following months.
At Furniture in Fashion we see plenty of customers timing a delivery around a decorating weekend, and it works well: paint the room first, then build the wardrobe into a finished space rather than working around wet walls. You can shop modern furniture UK across our full bedroom range, and Returns are available up to 30 days if a piece does not suit the room once it is standing.
Between one and four hours in most cases. A single door unit takes under an hour, a two door around one to two hours, and a large multi door wardrobe with drawers three to four hours.
Smaller wardrobes yes. On tall three, four or six door units the side panels are heavy and awkward, so a second pair of hands roughly halves the time and reduces the risk of damaging a panel.
Roughly the footprint of the wardrobe lying flat, plus room to walk around it. In most bedrooms that means moving the bed out before you start.
The carcass is often quicker, but the doors take longer because the tracks must be aligned and each door adjusted until it runs plumb. Allow an extra 30 to 45 minutes for the door stage.
Expect a full weekend for cutting, carcass assembly, interior fittings and doors, plus a further two to three days for filling, sanding and painting, mostly waiting for coats to dry.
Making your own wardrobe can take three quite different forms, and choosing the right one…
Sliding door wardrobe prices in the UK fall into three brackets: ready made freestanding units…
Wardrobe smells come from three things acting together: moisture, still air and worn clothing in…
Bar stools can often be shortened, but only some types, and telling them apart is…
Cut down your wardrobe by emptying it completely, sorting by category rather than by shelf,…
Building a built in wardrobe follows a fixed order, and the two stages that decide…
This website uses cookies.